top of page
DJI_0045.JPG

13m Wide Dragline Boom Section

To date, this is one of the most high pressure projects we have ever undertaken.

A major incident took out a dragline boom on of our clients mine sites.


This meant we were tasked with getting a brand new 13m wide piece of equipment out of industrial Johannesburg and onto the mine site as quickly as possible.


No easy feat considering the average road width was 7.0m.

We were working against the clock on this one because each day the mine was out of operation cost them on average of $1 million.


No pressure!

We moved mountains (and a tremendous amount of street furniture) to get this job done but we did it!


As always, we delivered on our promise to client!

m05_resized.jpg

13m Wide Dragline Boom Section

To date, this is one of the most high pressure projects we have ever undertaken.

A major incident took out a dragline boom on of our clients mine sites.

 

This meant we were tasked with getting a brand new 13m wide piece of equipment out of industrial Johannesburg and onto the mine site as quickly as possible.

 

No easy feat considering the average road width was 7.0m.

We were working against the clock on this one because each day the mine was out of operation cost them on average of $1 million.

 

No pressure!

We moved mountains (and a tremendous amount of street furniture) to get this job done but we did it!

 

As always, we delivered on our promise to client!

bottom of page