top of page
m07_resized.jpg

Julia Dredge for Kenmare mine

We were hired to deliver out of gauge cargo from the most rural areas of Mozambique through to the Kenmare mine.

Hauling heavy cargo across rural roads and bridges presents many challenges.

Most of which involve coming up with creative strategies to avoid weak bridge structures.


We pored over maps to and had to design solutions to be able to cross the feeble infrastructure which included reinforced bridge ramps, bridge propping and bypasses.

We identified a safe routing and implemented the necessary precautions and we were on our way.

The delivery was completed with no hiccups and our client was happy.


Mission accomplished.

bottom of page